Model:CAPG-B2
Jecsany the following is an introduction to CAPG-B2 Aluminum Hot Forged Bimetallic Sheet Bimetal Cable PG Clamp, I hope to help you better understand CAPG-B2 Aluminum Hot Forged Bimetallic Sheet Bimetal Cable PG Clamp. The Parallel Groove clamp with a friction welded copper insert clearly marked in blue for making copper conductor connections.The clamps have serrated transverse grooves for maximum conductor contact, use dacromet steel bolts and utilize belleville washers to prevent thermal ratcheting under cyclic loads.Interface between aluminium clamp body and tap copper shape is protected.The clamps are coated with an oxide inhibitor.And hot-dip galvinized steel bolts and nuts was on requirment, also we can change to stainless bolts and nuts with washers.
Professional China quality CAPG-B2 Aluminum Hot Forged Bimetallic Sheet Bimetal Cable PG Clamp Manufacturers and Suppliers. Jecsany is a CAPG-B2 Aluminum Hot Forged Bimetallic Sheet Bimetal Cable PG Clamp manufacturer and supplier in China. CAPG-B2 series bimetallic parallel groove clamp is designed to connect two parallel bare conductors. Aluminium alloy conductor for main side and copper conductor for tap side.
Product Parameter (Specification)
Type | Conductor Range | No. x Bolts |
CAPG-A1 | Cu 6-50 mm² , Al 16-70 mm² | 1 x M8 |
CAPG-A2 | Cu 10-95 mm² , Al 25-150 mm² Cu 10-95 mm², AL 16-150 mm² | 1 x M8 |
CAPG-B1 | Cu 6-50 mm² , Al 16-70 mm² | 2 x M8 |
CAPG-B2 | Cu 10-95 mm² , Al 25-150 mm² Cu 10-95 mm², AL 16-150 mm² | 2 x M8 |
CAPG-B3 | Cu 25-185 mm² , Al 25-150 mm² CU 16-185 mm², AL 35-240 mm², CU 16-185 mm², AL 25-200 mm² | 2 x M10 |
CAPG-C1 | Cu 6-50 mm² , Al 16-70 mm² | 3 x M8 |
CAPG-C2 | Cu 10-95 mm² , Al 25-150 mm² | 3 x M8 |
CAPG-C3 | Cu 25-185 mm² , Al 35-240 mm² | 3 x M10 |
CAPG-C4 | Cu 35-240 mm² , Al 35-300 mm² | 3 x M10 |
Product Feature And Application
Material: | Aluminium |
Structure: | C Clamp |
Measurement system: | Metric |
Type: | Bolts type |
Application: | connect two parallel bare conductors |
Usage: | Heavy Duty |
Lead Time:
Quantity(Meter) | 1 - 1000 | 1001 - 10000 | >10000 |
Est. Time(days) | 15 | 45 | To be negotiated |
Product Details